Skip to main content
Infrastructure construction project with formwork and shoring systems
Infrastructure Specialists

Heavy Infrastructure Solutions

Ontario's specialist for bridge, tunnel, and underground construction formwork. P.Eng certified, MTO compliant, 24/7 emergency support.

15+

Years Experience

24/7

Emergency Response

P.Eng

On Every Project

MTO

Compliant Systems

Infrastructure Specialists

Why Avema for Infrastructure?

While others generalize, we specialize. Our focus on heavy infrastructure means deeper expertise, better equipment, and faster response.

MTO Compliant Systems

Formwork and shoring systems designed for Ministry of Transportation project requirements. Ontario Public Works standards. CSA S269.1 certified designs. Traffic management protocols.

24/7 Emergency Response

Critical infrastructure failures demand immediate action. Emergency crews mobilize within 4 hours. Night and weekend work capability. Traffic closure coordination. Emergency shoring designs within 24 hours. Bridge strike response protocols.

P.Eng on Every Project

In-house Professional Engineers provide stamped drawings per CSA S269.1 and OHSA Reg. 213/91. Load calculations for all configurations. On-site engineering support during construction. Design modifications within 24 hours. Final certification documentation.

Infrastructure-Ready Inventory

10,000+ tons of heavy-duty equipment specifically for infrastructure projects

Shoring Systems
Specification Load Capacity Height/Span Special Features
PERI MULTIPROP Towers 200 kN (45,000 lbf) capacity 20m (65 ft) max height 200 kN/m² (4,175 psf) slab loads
MEVA MEP Aluminum 500 kN (112,000 lbf) per tower 1.25m x 1.25m (4 ft x 4 ft) grid 40% lighter than steel
Heavy-Duty Props 90 kN (20,200 lbf) per prop 2.5-5.0m (8-16 ft) heights Modular extensions
Steel Beams Up to 12m (39 ft) spans W-sections to W610x140 100 kN/m (6,850 lbf/ft) capacity
Specialized Equipment
Specification Span/Depth Capability Load Rating Key Features
Hydraulic Travelers Tunnel vault forms 15m span 250 kN/m² (5,220 psf) capacity 10-15m/day advance
Climbing Systems Pier construction to 30m height Hydraulic jacks 500 kN capacity Self-climbing capability
Suspended Platforms Bridge access 2.4 kPa (50 psf) Wind rated to 90 km/h (56 mph) Moveable along span
Excavation Boxes Deep foundations to 30m depth Earth pressure 100 kPa (2,090 psf) Hydraulic struts

Recent Infrastructure Projects

Trusted by MTO, municipalities, and major contractors across Ontario

MTO Project

Highway Bridge Program

12 bridge structures with complete shoring and formwork systems. 200 kN/m² (4,175 psf) deck loads. 18m (60 ft) span capability. MTO traffic management protocols.

Metrolinx

Urban Transit Infrastructure

Underground station construction with specialized excavation support systems. 25m (82 ft) excavation depth. Earth pressure 100 kPa (2,090 psf). Hydraulic struts and walers. Groundwater control with dewatering.

Emergency

Emergency Bridge Repair

Emergency repairs completed in 72 hours with 24/7 support and rapid deployment. Bridge strike damage assessment. Temporary shoring 500 kN capacity. Live traffic maintained. P.Eng emergency certification within 12 hours.

Ontario's Heavy Infrastructure Specialist

When your project demands expertise, equipment, and immediate response, there's only one choice. 10,000+ tons ready in Milton. P.Eng stamped drawings included. 24/7 emergency mobilization available.